The equipment after assembly is provided by manufacturer and check shall be carried out as soon as receiving product in order to avoid possible troubles during transportation.
1. It is suggested to install the equipment on concrete base to decrease vibration, noise and absorption of shock in order to avoid impact on building base. Adding ironwood, rubber belt or other buffer materials may as well.
2. Weight of base can be determined at 5-10 times of that of equipment and the depth of base shall be more than that of local frozen earth. Refer to the Base figure for locations of installing equipment and foundation bolt.
3. Before adjusting discharge door, release strain spring, and then adjust spring in order to prevent drop of ancon plate.